Regulator Finds 61% of Home Batteries Substandard: What Queensland Owners Must Check
On 16 November 2026, the Clean Energy Regulator published its annual inspection report for the 2025–26 Small-scale Renewable Energy Scheme (SRES). It is the first full-year report card on the home battery boom, and it makes uncomfortable reading for anyone who has bought, sold or installed a battery in the past year.
The headline figure is stark. Of the battery installations the regulator inspected at random, 61.19% were rated substandard. Fewer than 1% were rated unsafe. The rest — 37.86% — were adequate.
That distinction matters enormously, and it is the first thing to get right. Substandard does not mean dangerous. It does not mean the battery is faulty. It means the installation contains faults that need to be rectified, even though the system could safely remain in operation. Unsafe means something else entirely: the system was not safe to remain in operation as it was, and the inspector shut it down or otherwise made it safe.
This blog explains what the Clean Energy Regulator actually found, what the most common faults are in plain English, why batteries scored so much worse than solar panels, what happens to installers who keep getting it wrong, and what Queensland and Brisbane owners should check — whether their battery is already on the wall or still only a quote on the kitchen table.
Who is involved: the Clean Energy Regulator runs the federal inspection program and oversees compliance with the SRES. Solar Accreditation Australia (SAA) manages installer accreditation and follows up required rectification work. State and territory electrical safety regulators enforce electrical safety rules. Installers, retailers, developers and homeowners all sit inside that chain — and this report shows where the chain is weakest.
When: the report was published on 16 November 2026 and covers the 2025–26 financial year. The battery installations it inspected were installed between 1 July 2025 and 30 April 2026. The solar installations covered a longer window, from 1 July 2024 to 30 April 2026.

The findings at a glance
The regulator completed a record 6,554 solar and battery inspections in 2025–26 — 3,425 solar battery systems and 3,129 solar PV systems. More than 438,000 battery installations were recorded under the scheme in 2025/26, and the regulator validated 138.5 million small-scale technology certificates (STCs) across the scheme in the same year. The inspection program therefore looks at a small sample of a very large market — which is exactly why the results deserve careful reading rather than panic.
Randomly selected installations inspected | 3,373 | 3,129 |
Additional inspections outside the random sample | 52 | 0 |
Total inspections | 3,425 | 3,129 |
Adequate | 37.86% | 75.97% |
Substandard | 61.19% | 23.11% |
Unsafe | 0.95% (32 systems) | 0.93% (29 systems) |
Installation dates covered | 1 July 2025 – 30 April 2026 | 1 July 2024 – 30 April 2026 |
Most common faults | Missing or incorrect labelling; missing or incorrectly configured wiring, including backup-supply RCD arrangements; insufficient rated circuit protection; inadequate physical protection for cables and the battery | Incorrectly sized or fitted cabling and conduits; improper bonding or earthing of panel frames and other equipment; incompatible or incorrectly installed DC connectors; improperly fitted mounting structures; system design issues |
The report also publishes one trend that points in the right direction. The battery substandard rate fell from 68.3% for installations completed in August 2025 to 54.9% for installations completed in April 2026 — a 13.4 percentage point improvement across the year. That is real progress. It is also still more than half of the sampled April installations failing to meet the standard.
Why the battery rate is so much higher than solar
The gap is the most striking feature of the report: 61.19% of inspected batteries were substandard, against 23.11% of inspected solar systems. That is not a small difference. It is nearly three times the rate. There are several honest reasons for it, and none of them is that batteries themselves are unreliable.
Batteries are newer work for most installers. Rooftop solar has been installed in Australia for more than a decade. The rules, the mounting, the cabling and the common mistakes are well understood, and most installers have done hundreds of solar jobs. Batteries only became eligible under the SRES on 1 July 2025, when the Cheaper Home Batteries Program began, and the regulator's battery inspections only began on 15 July 2025. A large number of installers were therefore doing battery work at scale for the first time, under time pressure, in a market that grew extremely fast.
A battery installation is more complex than a solar-only installation. A solar system has panels, an inverter and a connection to the switchboard. A battery adds a storage unit, a battery inverter or hybrid inverter, backup circuits, additional protection devices, and labelling that must tell an electrician — or an emergency responder — exactly what is live, what is backed up, and what is not. Every extra component is another place where a detail can be missed.
The labelling rules are detailed and unforgiving. The leading reason for a substandard battery rating was missing or incorrect labelling. That sounds trivial until you understand what the labels do. They identify which circuits are supplied by backup power, they warn that more than one source of supply exists, and they tell anyone working on the switchboard where the battery can still energise a circuit after the grid is isolated. An installation with perfect wiring but wrong labels still fails, because the next person to open that switchboard is working with wrong information.
What substandard actually means — and what it does not
The single most important sentence in this whole story is the definition. The Clean Energy Regulator uses three ratings, and they mean very different things.
Adequate means the installation met the requirements. No rectification needed.
Substandard means the installation contains faults that need to be rectified, but the system could safely remain in operation. The faults are real — they breach a clause of an Australian Standard or an industry guideline — but the inspector judged that the system was safe to keep running while they are fixed.
Unsafe means the system was not safe to remain in operation as it was. The inspector shut it down or otherwise made it safe.
Three things follow from those definitions that every owner should understand.
First, 61% substandard does not mean 61% unsafe. Only 0.95% of the randomly inspected battery systems — 32 out of 3,373 — were rated unsafe. For solar, the unsafe figure was 0.93%, or 29 out of 3,129. The unsafe rate is low, and it is almost identical for batteries and solar. The problem the report identifies is a quality and compliance problem, not a widespread safety emergency.
Second, the findings describe the installations inspected. The regulator inspects a sample of systems, and owners must give written consent before an inspection proceeds. The percentages describe that sample. Do not extrapolate them to every system in Australia as if 61% of all home batteries in the country were substandard. The sample is large — more than 3,300 batteries — and it was randomly selected, so it is a serious signal about the industry. But it is not a census, and it should not be quoted as one.
The most common battery faults, explained in plain English
The report lists four main groups of battery faults. Here is what each one means for a homeowner standing in front of their switchboard.
Missing or incorrect labelling — the leading reason. Every battery installation must carry labels that identify the system, warn about multiple sources of supply, and mark which circuits keep running on backup power when the grid goes down. Inadequate identification of circuits supplied by backup power was a common specific failure. Why it matters: if the grid fails and your battery keeps the fridge circuit live, anyone working on that circuit needs to know it is still energised. A missing label turns a safe isolation into a dangerous assumption. This is also the fault the regulator has attacked most directly, as explained below.
Missing or incorrectly configured wiring, including backup-supply RCD arrangements. An RCD — a residual current device, commonly called a safety switch — cuts power when it detects a fault current that could shock someone or start a fire. In a battery system, the wiring that supplies backup circuits must be configured so the safety switch still protects those circuits when the battery, rather than the grid, is supplying them. If that arrangement is missing or wrongly configured, the safety switch may not protect the circuits it is supposed to protect. This is not a cosmetic issue. It goes to the core purpose of the device.
Insufficient rated circuit protection. Circuit breakers and fuses must be rated to suit the cables and equipment they protect. If the protection is rated too high for the cable, the cable can overheat before the breaker trips. If it is rated incorrectly for the battery or inverter, it may not clear a fault properly. Getting this right is basic electrical design — which is why its failure shows up so often in a rushed market.
Inadequate physical protection for cables and the battery. Cables must be protected from damage — from weather, from being knocked, from vermin, from being crushed or cut. Batteries must be installed where they are protected from physical damage and, where required, from heat and direct exposure. A cable run left exposed on a wall, or a battery installed where it can be struck by a vehicle or damaged by stored goods, is a fault waiting for an accident.
None of these faults is exotic. None requires new technology to fix. All of them are the kind of detail that a careful installer checks as a matter of routine, and that a rushed installer skips. That is consistent with what the report says about workmanship: it is reported that the common areas of non-compliance are almost entirely the result of poor workmanship rather than faulty products.
The most common solar faults, explained in plain English
Solar fared much better — 75.97% adequate — but the faults that did appear will be familiar to anyone who has followed solar quality issues in Australia.
Incorrectly sized or fitted cabling and conduits. Cables that are too small for the current they carry can overheat. Conduits that are poorly fitted leave cables exposed to UV, water and mechanical damage. Sizing is a calculation, not a guess, and it must account for the route, the temperature and the grouping of cables.
Improper bonding or earthing of panel frames and other equipment. Metal frames and rails must be bonded and earthed so that a fault cannot leave them live. Poor earthing is invisible until something goes wrong, which is exactly why inspectors check it.
Incompatible or incorrectly installed DC connectors. Solar panels are joined with DC connectors. Mixing connector brands or types that are not rated to work together, or fitting them incorrectly, creates a connection that can arc, overheat and, in the worst case, start a fire on a roof. This has been a known industry issue for years, and it still appears in inspection findings.
Improperly fitted mounting structures. Panels must be fixed to the roof so they stay fixed in wind. Poorly fitted rails, clamps and fixings are a structural risk as well as an electrical one.
The solar unsafe figures tell their own story. Of the 29 solar systems rated unsafe, 16 were due to unsafe installation work, 12 were due to a third-party incident such as weather damage, and 1 was attributed to a product recall. For batteries, of the 32 systems rated unsafe, 23 were due to unsafe installation work including loose connections, 8 were due to a product recall, and 1 was a third-party incident. Loose connections dominate the battery unsafe list. A loose connection heats up, and heat is what turns a minor defect into a fire risk.
Why quality improved — but is still poor
The improvement from 68.3% substandard in August 2025 to 54.9% in April 2026 is the most encouraging number in the report, and it deserves to be taken seriously. A 13.4 percentage point improvement in eight months, in a market installing hundreds of thousands of systems, does not happen by accident. It happened because the regulator intervened, and because the industry started to learn.
From 1 March 2026, installers had to provide photo evidence of compliant battery labelling, verified with timestamps, location data and automated image checks. That single change targets the leading fault directly: if you must photograph the label, in place, with proof of when and where the photo was taken, you are much less likely to skip the label or fit it after you have left.
The regulator also added inspection providers, contacted installers directly, and worked with Solar Accreditation Australia on training, including a free labelling course. But 54.9% is still more than half. An industry that gets the basics right barely half the time, on the systems it installed most recently in the sample, has not fixed the problem. It has started to fix it. There is a difference, and owners should not let the improvement hide the remaining gap.
There is also a hard limit on what this report can tell us about the present. The battery data ends on 30 April 2026. It cannot tell us about installation quality after the 1 May 2026 incentive changes, when the battery certificate factor began tapering across three bands of usable capacity: the first 14 kWh at 100%, the next 14 kWh at 60%, and capacity above 28 kWh up to 50 kWh at 15%. Whether quality kept improving after April 2026 is unknown — the data simply does not cover it. The next report will answer that question. This one cannot.
For 2026/27, the regulator says it will shorten the time between installation and inspection, with more follow-up, education and regulatory action proportionate to repeated non-compliance.
What happens when an installer is caught
The report sets out an enforcement ladder, and the numbers show it is being used.
Since 1 July 2025, the regulator has communicated with more than 830 installers about adverse inspection outcomes. That communication breaks down into 716 initial advisory letters, 121 warning letters for repeated non-compliance, and one notice of intent to suspend an installer.
Enforcement step | What it means | Number since 1 July 2025 |
Initial advisory letter | The installer is told about an adverse inspection outcome and its obligations under the scheme | 716 |
Warning letter | Issued for repeated non-compliance — a formal escalation | 121 |
Notice of intent to suspend | The regulator is moving toward suspending the installer from the scheme | 1 |
Installers contacted in total | Installers communicated with about adverse outcomes | More than 830 |
The regulator can suspend installers with three or more inspection reports with adverse findings, or three or more written statements containing false or misleading information. The regulator's message, quoted in the report, is blunt: "Our message to installers is simple — do it once and do it well."
What this means for investors and developers
If you invest in, develop or finance residential solar and battery projects, this report changes the risk picture in three ways.
Quality risk is now a documented, quantified risk. A 61.19% substandard rate in the inspected sample is not a rumour or an anecdote. It is the regulator's own figure, from a random sample of more than 3,300 battery installations. Any financial model that assumed installation quality was a minor issue needs to be revisited. Rectification work, re-inspection, delayed commissioning and reputational damage all cost money, and they fall on the party that cannot show the work was done right.
Installer selection is now a diligence item, not a procurement afterthought. The enforcement data shows the regulator is tracking installers individually and escalating repeat offenders. A developer or investor should be asking for an installer's inspection history, its rectification record, and evidence of its training — including whether its crews have completed the labelling training the regulator and SAA promoted. A cheap installer with a poor inspection record is not cheap.
None of this argues against batteries. The economics of storage, the value of backup power, and the direction of the market have not changed. What has changed is the evidence about how often the work is done properly. Investors who price that evidence in — and who insist on independent checks before handover — will do better than those who treat installation quality as someone else's problem.
What this means for commercial and industrial buyers
For a business buying solar and batteries, the stakes are higher than for a household, and the report's lessons apply with more force.
Scale multiplies the fault rate. A commercial battery system is larger, more complex, and more likely to include backup circuits, multiple inverters and integration with existing switchboards. If the residential substandard rate is 61% in the inspected sample, a commercial buyer should assume that the same failure modes — labelling, RCD configuration, circuit protection, cable protection — can appear in their project, and should budget for independent verification rather than assuming the installer's own sign-off is enough.
The 1 January 2027 STC step-down adds timing pressure. From 1 January 2027, the solar deeming period steps down from 5 years to 4 years, and the battery STC factor steps down from 6.8 to 5.7, on published guide figures. That step-down will push some buyers to commit before the deadline — and rushing a commercial installation to beat a deadline is exactly how labelling gets skipped and protection gets mis-sized. A buyer who commissions early to protect the certificate value, but accepts a substandard installation, has traded a small financial gain for a larger rectification and safety problem.
Independent review is cheaper than rectification. A commercial buyer should treat an independent technical review of the design and the completed installation as part of the project cost, not as an optional extra. The report's figures make the case: if more than half of inspected residential batteries needed rectification, the probability that a commercial system needs at least one correction is not low. Finding it before handover, while the installer is still on site and still contractually responsible, is far cheaper than finding it in a regulator's inspection months later.
What this means for homeowners
For a homeowner, the report raises a practical question: is my system one of the good ones, or one of the 61%? Here is how to think about it.
If your battery was installed between July 2025 and April 2026, it sits inside the period this report covers. That does not mean your system is substandard. It means your system was installed during the period when the inspected sample had the highest fault rates. If you have not had an independent check, you have no evidence either way — only the installer's word and the fact that the system appears to work.
A system that works is not necessarily a system that is compliant. This is the hardest idea in the whole report for owners to accept. A battery can charge, discharge, back up the fridge and show a healthy app dashboard while still having the wrong labels, the wrong RCD configuration, or undersized protection. Substandard installations, by definition, could safely remain in operation. They work. They are still wrong, and they still need to be fixed.
The federal discount does not mean your system passed inspection. The Cheaper Home Batteries Program discount is claimed through STCs when the system is installed. The regulator inspects only a sample of systems, and owners must give written consent before an inspection proceeds. Receiving the discount tells you the paperwork was lodged. It tells you nothing about whether an inspector has looked at your switchboard.
Check the basics yourself, then get a professional to check the rest. An owner can look for the labels: is there a clear label at the switchboard identifying the battery, the backup circuits and the multiple sources of supply? Is the battery physically protected and installed where it cannot be easily damaged? If any of those answers is no, or if you are not sure, that is a reason to ask a licensed electrician — not a reason to panic, and not a reason to open the switchboard yourself.
What this means for Queensland / Brisbane buyers
Queensland is where this report matters most, for a simple reason: volume. Queensland had the highest October 2026 rooftop solar volume of any state in the SunWiz data reported on 6 November 2026 — 75.8 MW in October, and a record January to October tally. Queensland homes are also the biggest battery market in the country. Where the most systems are being installed, the most substandard installations will be found in absolute numbers, even if the percentage is the same as elsewhere.
There is also a specific piece of Queensland context that must be stated carefully. In interim reporting in February 2026, Queensland was noted as featuring a higher rate of installs that breached regulations. That is interim-report context only. It is not a finding of the 16 November 2026 annual report, and this blog does not present it as one. The annual report does not publish a Queensland percentage, and no Queensland percentage is invented here. What the interim note does tell us is that Queensland was already on the regulator's radar early in the battery boom — which is consistent with Queensland being the largest market.
For a Queensland or Brisbane buyer, the practical implications are concrete.
Connection approvals add a layer of scrutiny — use it. In South East Queensland, Energex is the distribution network service provider. In regional Queensland, it is Ergon Energy. Both must approve the connection of a solar and battery system, and both have technical requirements that sit alongside the federal scheme rules. A system that satisfies the network's connection requirements but has the labelling and protection faults in this report is still substandard. Ask your installer how the Energex or Ergon connection approval interacts with the SRES inspection requirements, and make sure the handover documentation covers both.
Feed-in tariffs do not protect you from a poor installation. In regional Queensland, the Queensland Competition Authority sets a feed-in rate of 6.006 cents per kilowatt-hour from 1 July 2026. In the Energex area of South East Queensland, feed-in tariffs are retailer-set, so the rate depends on your retailer and plan. Neither rate tells you anything about installation quality. A generous feed-in tariff on a substandard battery is still a substandard battery.
The 1 January 2027 step-down will create a Queensland rush. The STC step-down on 1 January 2027 — solar deeming from 5 years to 4 years, and the battery STC factor from 6.8 to 5.7, on published guide figures — will push Queensland buyers to install before the deadline. Queensland's market is already the largest in the country. A deadline-driven surge in the largest market is exactly the condition that produced the August 2025 peak of 68.3% substandard. Buyers who commit early should insist on the same checks they would insist on at any other time of year, and should be wary of any installer who says the deadline means the checks can be skipped.
If you are buying now, buy the check, not just the battery. A Queensland buyer in late 2026 is buying into a market where the regulator has just published a 61% substandard rate for the inspected sample. That is not a reason to avoid batteries. It is a reason to make an independent check part of the purchase — a quote review before you sign, and an engineer's review of the design and the completed installation before you accept handover.
What EServices4U would check independently
An independent review is only useful if it checks the things that actually fail. Here is what we would look at, mapped to the faults in this report.
Labelling and identification. Are the battery, the inverter, the switchboard and the backup circuits labelled correctly and completely, including identification of the circuits supplied by backup power? Is there a clear warning about multiple sources of supply? This is the leading fault in the report, and it is the easiest to check — and the easiest to fix if it is caught before handover.
Backup-supply protection. Is the RCD arrangement for backup circuits configured correctly, so that safety switches protect the circuits they are supposed to protect when the battery is supplying them? Is the circuit protection rated correctly for the cables and equipment it protects? These are design checks that belong in a review of the quote and the single-line diagram, before the system is installed — not after.
Cable sizing, routing and physical protection. Are cables sized correctly for the load, the route and the temperature? Are they routed and protected so they cannot be damaged? Is the battery installed where it is physically protected? These are checks of the design and of the finished installation, and they are the faults that deteriorate fastest in Queensland conditions.
DC connectors, earthing and mounting. Are the DC connectors compatible and correctly installed? Is the bonding and earthing of panel frames and equipment correct? Are the mounting structures properly fitted? These are the solar-side faults in the report, and they matter just as much on a combined solar-plus-battery job, where the solar and battery work is often done by the same crew on the same day.
The services that do this work. A quote review ($149) checks the quote, the equipment, the design and the fine print before you sign — including whether the labelling, protection and connection requirements are actually covered. A feasibility assessment ($299) tests whether the system size, the battery capacity and the expected performance stack up for your home or building. A Home Owner's Engineer service ($599) provides independent engineering oversight of the project, including review of the design and the completed installation. For commercial projects, a Commercial Infrastructure Assessment / RPEQ & RPEV SLD Sign-Off ($495) reviews the design, the single-line diagram and the infrastructure against the applicable requirements. Each of those is a fixed-fee review. None of them is a sales exercise — EServices4U does not sell solar installations and does not receive installer commissions.
Frequently asked questions
Were 61% of home batteries unsafe?
No. The Clean Energy Regulator rated 61.19% of the randomly inspected battery installations as substandard, and 0.95% — 32 systems — as unsafe. Substandard means the installation contains faults that need to be rectified, but the system could safely remain in operation. Unsafe means the system was not safe to remain in operation as it was, and the inspector shut it down or otherwise made it safe. The two ratings are not the same, and they should never be reported as if they were.
Does the federal discount mean my system passed inspection?
No. The discount under the Cheaper Home Batteries Program is claimed through STCs when the system is installed. The regulator inspects only a sample of systems, and owners must give written consent before an inspection proceeds. Receiving the discount tells you the paperwork was lodged. It does not tell you whether an inspector has examined your installation, and it is not a certificate of quality.
Can I request a free CER inspection?
The regulator selects the systems it inspects; owners cannot book an inspection on demand. If your system is selected, you will be asked for written consent, and consenting gives you an independent assessment at no cost to you. If you want an independent check outside the regulator's program, that is what a quote review or an engineer's inspection is for — and you can arrange one yourself.
Who fixes a substandard installation?
The installer. Where a substandard or unsafe outcome relates to the installer's work, the installer must return to fix the items marked for rectification and provide evidence of the fix to Solar Accreditation Australia. If your installer refuses, or has stopped trading, raise it with SAA and with your state electrical safety regulator, and seek independent advice on your options. Keep every document — the quote, the contract, the certificate of compliance and the handover pack — because that is the evidence of what was promised.
Is my battery itself faulty if my installation is substandard?
Not necessarily, and in most cases, no. It is reported that the common areas of non-compliance are almost entirely the result of poor workmanship rather than faulty products. The faults the report lists — labelling, wiring, circuit protection, cable protection — are installation faults. That said, 8 of the 32 battery systems rated unsafe were due to a product recall, so product recalls do occur. Verify whether any product in your system is subject to a recall — your installer should be able to confirm this, and the regulator publishes recall information.
Has installation quality improved since the report's data ends?
The report shows improvement within its own data: the battery substandard rate fell from 68.3% for August 2025 installations to 54.9% for April 2026 installations. But the battery data ends on 30 April 2026, before the 1 May 2026 incentive changes. Whether quality kept improving after April 2026 is unknown — the report cannot answer that question, and neither can this blog. The next report will. Until then, the honest position is that quality was improving, but was still poor at the last point the data covers.
Should I still buy a home battery?
The report does not say batteries are a bad idea. It says that, in the sample inspected, most battery installations had faults that needed fixing, and that those faults were almost entirely due to poor workmanship. The right response is not to avoid batteries. It is to buy carefully: choose an installer with a good record, get the quote and the design reviewed independently before you sign, and get the completed installation checked before you accept handover. A battery that is installed properly is a good asset. A battery that is installed badly is a rectification job waiting to be found.
What to do next
If you already have a battery, do not panic — and do not assume everything is fine. Check the labels at your switchboard, check that the battery and its cables are physically protected, and keep your documentation where you can find it. If your system is selected for a regulator inspection, consent to it. If you have any doubt about the installation, get an independent engineer to look at it. Do not open a switchboard or attempt electrical work yourself.
If you are about to buy, build the independent check into the purchase. Review the quote before you sign. Review the design before the installation starts. Check the completed installation before you accept handover. And remember the timing: the 1 January 2027 STC step-down will create pressure to install quickly. Pressure is when the faults in this report happen.
EServices4U is an independent solar and electrical engineering advisory business, based in Queensland and serving Australia-wide. We do not sell installations and we do not take installer commissions. Our fixed-fee reviews are set out on the packages and pricing page, and you can read more about the team on the team page or request a quote review.
Start with a free 15-minute consultation to talk through your tender, system, building, or project and find out which fixed-fee review fits, if any. Call/WhatsApp 0480 001 498 or email growthpartner@eservices4u.com.au. No obligation, and it does not include a written report.
Quote review — $149. An independent review of your solar or battery quote before you sign, checking the equipment, the design, the labelling and protection requirements, and the fine print.
Solar and battery feasibility assessment — from $299. An independent check of whether the proposed system size, battery capacity and expected performance stack up for your home or building.
Home Owner's Engineer — from $599. Independent engineering oversight of your project, including review of the design and the completed installation.
Commercial Infrastructure Assessment / RPEQ & RPEV SLD Sign-Off — from $495. A technical review of the design, single-line diagram and infrastructure for commercial projects.
The regulator's message to installers was simple: do it once and do it well. For owners, the message is just as simple: check it once, and check it independently, before you pay for it.





Comments