Queensland Childcare Centre Solar: Daytime Loads, Child Safety and Bills That Shrink

5 minutes ago
20 min read

A Queensland childcare centre is one of the best-matched buildings in the state for solar — and one of the buildings where getting the design wrong carries the highest stakes. The centre opens early, fills with children, runs air conditioning through the Queensland heat, heats water for kitchens and laundry, keeps fridges and freezers cold, cooks lunch, washes linen, and stays busy until early evening. Almost all of that happens while the sun is up. That is the opportunity. The responsibility is just as clear: the building is full of small children, so every panel, cable, inverter and battery must be placed, fenced and shut down safely, and no savings claim should ever be made at the expense of a safe, compliant installation.


This guide is written for centre operators, directors, owners and multi-site groups in Brisbane and across Queensland — and for the landlords, boards and committees who own the buildings those centres operate in. It explains where a childcare centre's energy actually goes, how solar should be sized around a daytime load profile, what child-safety design looks like in practice, what batteries can and cannot do for evening cleaning, security and blackout cover, how export limits and tariffs work on the Energex network in South East Queensland and the Ergon Energy network in regional Queensland, and what to check in a tender before signing. It uses published Queensland childcare examples, labels installer-published figures as installer-published, and does not present them as verified outcomes for your centre. EServices4U is based in Queensland and serves clients Australia-wide.


Where a number comes from a published case study it is labelled as such, with the source and its date — or the absence of a date — stated plainly. Installer estimates are labelled installer-published and are not presented as verified outcomes for your centre. Verify every rebate, tariff, standard and network claim against the current approval for your site before you commit. No figure in this guide is a promise of savings, payback or compliance for your centre.


Queensland childcare and early learning centre in Brisbane with rooftop solar panels above shaded play areas, air conditioning and a safe fenced playground

Why a childcare centre's daytime profile fits solar so well

Most commercial buildings waste some of their solar because they are empty when the sun is strongest, or because their biggest loads run at night. A childcare centre is the opposite. It is occupied from early morning to early evening, five days a week, for most of the year, and its biggest loads are daytime loads.


  • Operating hours match the solar day: Most Queensland centres open around 6:30am and close around 6:30pm. Solar generation typically runs from mid-morning to mid-afternoon in winter and longer in summer. The overlap is long — several hours a day, five days a week — which is the foundation of good self-consumption.

  • Air conditioning is the biggest load: In Queensland heat and humidity, cooling is not a comfort extra. It is a health and safety requirement for babies, toddlers and preschoolers, and it runs hard through the middle of the day. That is also when solar output is highest. A centre that cools rooms from 10am to 3pm is using solar electricity at the moment it is being generated.

  • Hot water, kitchens and laundry run in daylight: Lunch preparation, bottle warming, dishwashing, handwashing, nappy-change areas, laundry for linen, bibs and cloths, and cleaning all draw hot water and electricity during operating hours. These are steady, predictable daytime loads.

  • Fridges, freezers and food safety run all day: Milk, formula, food and medication storage need continuous refrigeration. A fridge that warms up is a food-safety problem, not just a cost problem. Refrigeration is a 24-hour load, but its daytime share is served directly by solar.

  • Lighting, ventilation and office loads are daytime loads: Classrooms, sleep rooms, offices, reception and staff areas need lighting and ventilation while children are present. These loads are smaller than air conditioning, but they are consistent and they sit squarely in solar hours.


Where the energy actually goes in a childcare centre

Load

When it runs

Why it matters for solar

Air conditioning and ventilation

All day, hardest 10am–4pm in summer

Largest load; aligns closely with solar output; heat and humidity drive peak demand

Hot water — kitchens, bathrooms, laundry

Morning and midday peaks, steady through the day

Daytime load; electric hot water can be timed into solar hours; gas hot water is a separate fuel

Kitchen — cooking, ovens, dishwashers

Mid-morning to early afternoon

Daytime load; lunch preparation and clean-up sit in solar hours

Laundry — washers and dryers

Morning and afternoon

Daytime load; dryers are high-draw and should be timed, not run on timers that miss the sun

Refrigeration — fridges and freezers

24 hours, steady

Daytime share served by solar; overnight share is the battery question, not a panel question

Lighting — classrooms, sleep rooms, offices

All operating hours

Steady daytime load; LED upgrades cut it before solar is sized

Pumps, fans and controls

All day

Small individually, constant in total; part of the base load solar should cover first

Office, IT, security and communications

Operating hours plus overnight standby

Daytime share served by solar; overnight standby is small but continuous

Cleaning and evening loads

After 6pm, after children leave

After solar hours; the battery and tariff question, not a reason to oversize panels


Queensland examples: what published childcare projects show

  • Upper Mount Gravatt Kindergarten, Brisbane south side — a small centre, closely watched: The installer case study, with no date stated on the page, describes a 10.8 kWp system producing 18,240 kWh per year as published. Before solar, the centre bought 13,500 kWh per year from the grid. After solar, it buys 5,790 kWh, self-consumes 7,720 kWh and exports 10,520 kWh, as published. The installer reports the bill fell by over 90% — that is an installer-published figure, and it is not presented here as verified by EServices4U.

  • Sesame Lane Childcare Group, Brisbane — a multi-room centre at larger scale: The installer case study, with no date stated on the page, describes a 34.5 kW system with 115 modules and 1 inverter, with estimated annual production of 58.27 MWh, estimated carbon offsets of 22.84 tonnes per year, an installer-estimated yearly saving of $11,520, and a cost per kWh generated of $0.058. All of those figures are installer-published estimates, and they are labelled as such here. The installer also reports saving the group over 50% of energy usage — again, an installer-published figure, not a verified outcome.

  • Sunny Hills Childcare, Brisbane — a mid-size system with a safety detail worth noting: The installer case study, with no date stated on the page, describes a 30 kW system with 100 modules, estimated annual production of 41.37 MWh, an installer-estimated yearly saving of $8,259, and a cost per kWh of $0.054. Those figures are installer-published estimates. The case study also describes SolarEdge DC-optimised equipment with SafeDC panel shutdown to 1 volt DC when the inverter is not operating — an installer-published equipment detail, and one that is directly relevant to child safety. Rapid shutdown and module-level shutdown reduce the DC voltage present on a roof and in cabling when the system is off or faulted. That does not remove the need for correct placement, fencing and signage, but it is the kind of safety feature a centre should ask about by name, and compare between quotes, rather than accepting a generic "safe system" claim.

  • Mother Duck, Lawnton, Brisbane — a new centre built with sustainability in mind: A design-award listing from 2024 describes Mother Duck at Lawnton, a new centre that opened in September 2023 for 200+ children, with solar panels and rainwater collection as part of its sustainable facilities.

  • Loving Hearts Childcare, Currumbin Valley, Gold Coast — an early sustainability leader: A sustainability features document dated 4 March 2018 describes a 15 kW solar PV system, roofs orientated north and pitched steeper for panel efficiency, and a predicted at least 78% fewer operational greenhouse gas emissions than a comparable building. That emissions figure is a consultant-published prediction, and it is labelled as such here — it is not a measured outcome.


Sizing solar by centre size: indicative ranges to investigate

Centre type

Typical daytime load drivers

Indicative solar range to investigate

First question to ask

Small centre, 25–50 places

Split-system air conditioning, small kitchen, shared laundry

10–20 kW

How much load runs on a normal weekday, not just a busy Monday?

Mid-size centre, 50–100 places

Multiple air conditioning zones, commercial kitchen, on-site laundry

20–40 kW

What does air conditioning draw at peak on a hot February afternoon?

Large centre, 100–150 places

Large kitchen, full laundry, multiple zones, fridges and freezers

30–60 kW

How much hot water and laundry load can be timed into solar hours?

Very large centre, 150–200+ places

Full commercial kitchen, laundry, many zones, office and staff areas

50–100 kW

What does the network connection allow, and is a dynamic connection available?

Multi-site group, several centres

Same loads, repeated across sites, with different roofs and tariffs

Per-site sizing, not one size for all

Which sites have the highest daytime self-consumption, and which should go first?


Child safety: the design question that comes first

In a childcare centre, safety is not a section to add at the end of a tender. It is the first design constraint, and it should be written into the brief before any installer is asked to quote. Children climb, reach, touch and explore. A system that would be acceptable on a warehouse roof may not be acceptable above a playground, beside a sleep room, or within reach of a fence line.


  • Panel placement and roof access: Panels should be placed where children cannot reach them, climb to them, or throw objects at them, and where maintenance access does not require walking through play areas or classrooms. Roof access points, ladders and hatches must be locked, signed and out of children's reach. A panel above a playground needs a different risk assessment from a panel above a car park.

  • DC safety and shutdown: Solar panels generate DC electricity whenever light falls on them. Module-level shutdown, rapid shutdown and DC isolators reduce the voltage present when the system is off, faulted or being worked on. The Sunny Hills example, with SolarEdge SafeDC shutdown to 1 volt DC when the inverter is not operating, is an installer-published equipment choice that illustrates the kind of feature to ask about. Ask every tender to name its shutdown arrangement, its DC voltage when off, and its fault behaviour — in writing, not as a verbal assurance.

  • Inverter location: Inverters hum, warm up, and have live electrical parts. They should be in a locked, ventilated, weather-protected location that children cannot access, away from play areas, sleep rooms and handrails children could climb. An inverter mounted at child height on a playground fence is not acceptable, however convenient the cabling run. Ask where the inverter will go, how it will be locked, and how it will be ventilated in Queensland summer heat.

  • Cabling, conduits and isolators: No accessible cabling. Conduits should be fixed, protected and out of reach, with isolators labelled, locked where required, and placed where staff can reach them in an emergency but children cannot.

  • Compliance and sign-off: Solar installations must comply with the relevant Australian Standards, network requirements and installer accreditation rules. For a childcare centre, an independent review should check that the design, the equipment, the placement and the documentation all match the standards that apply to the site — and that the installer is accredited for the work quoted.


Operating hours, holidays and closures: the export question

A childcare centre is busy five days a week and quiet on weekends, public holidays and, for some centres, school-holiday periods. That pattern creates an export question that a residential quote will not address: what happens to solar generation when the building is empty?


  • Weekends: Most centres are closed on Saturdays and Sundays. Solar still generates. On a sunny weekend, a system sized for weekday loads will export a large share of its generation. That exported electricity earns the feed-in tariff, which is usually far below the retail price of electricity used on site. A weekend-heavy export profile weakens the business case for oversizing.

  • Public holidays and closures: Queensland public holidays, Christmas–New Year closures and centre-specific closure days all create the same effect: generation continues, load falls, export rises. A business case that assumes weekday self-consumption on every day of the year overstates the result.

  • School-holiday periods: Some centres stay full through school holidays. Others, particularly kindergartens and sessional services, have lower occupancy or close for part of the holidays. The effect depends on your service type and your enrolment pattern. Ask a tender to show self-consumption separately for operating days and for closure days, not as a single annual average.


Export limits, connection approvals and tariffs in Queensland

Export limits decide how much solar electricity you can send back to the grid, and therefore how much of an oversized system is wasted. In Queensland, the network operator depends on where you are: Energex covers South East Queensland, including Brisbane, the Gold Coast, the Sunshine Coast, Ipswich and the Scenic Rim; Ergon Energy covers regional Queensland, including the Gold Coast hinterland beyond the south-east, the Darling Downs, Central Queensland, North Queensland and the far north.


As a published guide summary — not as a substitute for your own connection approval — single-phase connections are commonly described as 10 kW of solar with 5 kW of export, and three-phase connections as 30 kW of solar with 15 kW of export. Those figures are a starting point for conversation only. Confirm your connection approval for your site, your phase, your network and your tariff before you rely on any export figure. Approvals vary by location, by existing load, by network capacity and by whether other solar is already connected nearby.


For larger centres, the conversation changes. A system above the basic export limit needs a negotiated connection, and in many cases a dynamic connection — sometimes called a flexible or dynamic export arrangement — that allows export to vary with network conditions. Dynamic connections can unlock a larger system, but they add complexity: export may be curtailed at times, monitoring and control requirements apply, and the commercial case must be tested against realistic export, not against an assumed full export at all hours.


Feed-in tariffs also vary. In regional Queensland, the Queensland Competition Authority sets the regional feed-in tariff, which was 6.006 cents per kilowatt-hour from 1 July 2026 for Ergon Energy areas. In South East Queensland, feed-in tariffs are set by retailers, not by the regulator, and they vary by retailer and plan. Either way, the feed-in tariff is usually far below the retail price of electricity you avoid by using solar on site. That is why self-consumption matters more than export in most childcare business cases.


Two network and tariff developments are worth understanding. First, it is reported that Energex and Ergon withdrew two-way export charges for small customers for 2025–2030, and that time-of-use is the default network tariff, under the Australian Energy Regulator's final decision in April 2025. In plain terms, a small childcare centre should not assume it will be charged for exporting, but it should understand that when it buys electricity matters: a kilowatt-hour bought in a peak period costs more than one bought off-peak.


Batteries: evening cleaning, security and blackout cover — without overpromising

  • Evening cleaning and security loads: After children leave, the centre still uses electricity: cleaning, laundry finishing, office work, security lighting, alarms and CCTV. A battery charged from daytime solar can carry part of that evening load. The size needed depends on the evening load, not on the size of the solar array. A small evening load needs a small battery, or none at all.

  • The federal battery program — and its limits: The federal Cheaper Home Batteries Program began on 1 July 2025, and it is reported that more than 600,000 batteries had been installed under it by early November 2026. It is a residential program, so a commercial childcare centre should not assume it applies to its site — verify eligibility before any battery incentive is included in a business case.

  • Fridge and freezer cover in a blackout: Milk, formula, food and medication storage need continuous refrigeration. A battery with backup capability can keep critical refrigeration, emergency lighting and communications running through a brief outage. It is not a substitute for a generator for a long outage, and it is not a substitute for a proper backup and food-safety plan. Ask which circuits are backed up, for how long, and what happens when the battery runs out.

  • Battery safety in a childcare setting: Batteries must be installed in a locked, ventilated, fire-separated location, away from children's areas, with clear signage, emergency procedures and staff training. The Clean Energy Regulator's 2025–26 SRES inspection report, published on 16 November 2026, found that 61.19% of inspected batteries were substandard, 23.11% of inspected solar systems were substandard, and under 1% were unsafe. Those findings describe inspected installations only — they do not describe every installation in Australia — but they are a reminder that battery quality, installation quality and inspection matter. A centre should ask for the battery's certification, the installer's accreditation, the inspection record and the warranty terms in writing, and should not accept a battery on price alone.


The mid-scale solar change: what it means for larger centres and groups

For most single centres, the solar system will be well under 100 kW, and the mid-scale framework will not apply. For a very large centre, or for a multi-site group considering a larger system at one site, it is worth understanding.


It is reported that applications under the Clean Energy Regulator's SRES mid-scale solar scheme opened on 17 November 2026, covering systems from 100 kW to 1 MW, with fixed five-year deeming. Under that framework, a system claims either STCs or REGOs, not both. For a large childcare site in the 100 kW to 1 MW range, that distinction matters to the financial model and should be confirmed with the current scheme rules before any figure is put in a business case. Verify the current rules at the time you commit — scheme details change, and a proposal written before the opening date may not reflect them.


Multi-site operators: consistent tendering across centres

A childcare group with several centres faces a different challenge from a single-centre operator: consistency. The same mistakes, repeated across five centres, cost five times as much. The same good practice, repeated across five centres, saves five times as much.


  • One specification, tested per site: A group should write one technical specification — panel and inverter standards, safety requirements, monitoring, warranties, shutdown arrangements, battery placement rules — and then test it against each site's roof, load, tariff and connection. One size does not fit all, but one standard should govern all.

  • Compare like with like: Tenders for different centres should be compared on the same basis: generation, self-consumption, export, tariff and demand assumptions shown separately for each site. A group that accepts a single lump-sum figure for all sites cannot tell which site is carrying the others.

  • Monitoring across the group: A live monitoring screen in reception, as described in the Sesame Lane case study, is useful at one centre. Across a group, centralised monitoring — generation, faults, and underperformance alerts for every site — is what turns solar from a set of separate systems into a managed asset. Ask what monitoring is included, who watches it, and who acts when a system stops generating.


Landlord versus operator: who owns the roof, who owns the system, who benefits

Many Queensland childcare centres lease their building. That creates a split that must be resolved before any solar is installed: the landlord owns the roof, the operator pays the electricity bill, and the solar system sits between them.


  • Consent and documentation: Landlord consent, structural checks, insurance, and network approvals all need to be in place before installation. A centre that installs solar without landlord consent risks a dispute that no savings figure can fix.


Solar-only, solar-plus-battery, and lease or PPA: comparing the options

Option

Who owns the system

Upfront cost

Who maintains it

Who claims incentives

Key risk to check

Solar only, owned outright

The centre or landlord

Highest upfront, no ongoing system payments

The owner, under warranty and service terms

The owner, subject to current scheme rules

Oversizing for weekend export; wrong sizing for the daytime load

Solar plus battery, owned outright

The centre or landlord

Higher upfront than solar only

The owner, including battery warranty and replacement assumptions

The owner, subject to current scheme rules and program eligibility

Battery sized for the wrong load; backup circuits not defined in advance

Lease or PPA, third-party owned

A third party, for the term

Low or no upfront cost

Usually the third party, under the agreement

Usually the third party, under the agreement

Long-term cost higher than owning; exit, sale and end-of-term terms; who benefits if the centre closes or moves

Do nothing, stay on grid

No system

No upfront cost

Not applicable

Not applicable

Continued exposure to retail prices, demand charges and tariff changes


What a system costs — and what the business case should include

A complete business case should include, at minimum:


Cost or value item

What to check

Installed system price

Panels, inverter, mounting, cabling, switchboard work, metering, commissioning — itemised, not a single lump sum

Network and connection costs

Application fees, network studies, upgrades, dynamic connection equipment, metering changes

Battery cost, if any

Battery, inverter, backup hardware, installation, warranty terms, replacement assumptions

Air conditioning and efficiency work, if any

Air conditioning upgrades, LED lighting, hot-water timers, insulation — priced separately from solar

Incentives claimed

STCs or REGOs, the deeming period applied, the installation date that sets the rate, and whether the incentive is assigned or claimed directly

Generation assumed

Yield per kW, temperature derating, shading, soiling, orientation — with the source of the yield figure named

Self-consumption assumed

The share of generation used on site, hour by hour, on operating days and on closure days separately — not an annual average

Export assumed

Export volume, export limit, feed-in tariff, and any curtailment under a dynamic connection

Tariff and demand charges

Current tariff, demand charges, and whether solar or batteries actually cut the peak

Ongoing costs

Monitoring, cleaning, maintenance, inverter replacement, battery degradation and end-of-life

Warranty and performance

Product and performance warranties, who honours them, and what happens if the installer is no longer trading

Safety and compliance costs

Fencing, signage, locked enclosures, fire separation for batteries, inspection and sign-off — included, not added later


The tender and review checklist: what an independent check looks at

  • Load profile versus generation profile: Does the proposal use your interval data, or does it use an assumed profile? Is generation matched to your daytime load hour by hour, including hot days, laundry days, kitchen peaks and quiet Fridays?

  • Safety design in writing: Where will panels, inverters, batteries, isolators and cabling go? How are they fenced, locked and signed? What is the DC shutdown arrangement, and what voltage is present when the system is off? Is the safety design in the quote, or only in a verbal assurance?

  • Export assumptions: What export limit is assumed? Is it your approved limit, or a generic figure? Under a dynamic connection, what curtailment is assumed, and what happens to the business case if export is curtailed more often? Is weekend and closure export shown separately?

  • Battery sizing and backup: What evening and overnight load is the battery sized for? What depth of discharge, round-trip efficiency and degradation are assumed? Is backup capability included, and which circuits — fridges, emergency lighting, communications — are backed up, and for how long?

  • Warranty and installer durability: Product warranties, performance warranties, workmanship warranties, and the installer's history. A 25-year panel warranty is only as good as the company that honours it.

  • RPEQ and RPEV sign-off for larger systems: Larger commercial systems may need engineering certification and network documentation. Check what sign-off is required, who provides it, and whether it is included in the price or charged separately.

  • Structural and roof checks: Roof condition, structural capacity, wind loading, access for maintenance and cleaning, and whether the roof will need replacement during the life of the solar system.

  • Contract terms: Purchase, lease or PPA — who owns the system, who maintains it, who claims the incentives, what happens at the end of the term, and what happens if the centre closes, moves or is sold?


Energy efficiency first: the companion measures solar cannot replace

  • Air conditioning: A modern, correctly sized, well-controlled air conditioning system uses far less electricity than an older fixed-speed unit doing the same job. Zoning — cooling only the rooms that are occupied — and controls that match cooling to occupancy and temperature matter as much as the unit itself.

  • LED lighting and controls: Lighting is a smaller load than air conditioning, but LED upgrades and occupancy controls cut it quickly and cheaply, and the saving happens every operating day.

  • Hot-water timing: Electric hot water that heats during solar hours uses low-cost on-site electricity. Hot water that heats overnight, on grid power, has a different cost. Timers and controls that shift hot-water heating into the solar window can lift self-consumption without adding panels.


How This Works for Both Sides

A good solar project for a childcare centre works for the centre and for the network — and a review should test both sides.


  • For the centre operator: Lower daytime grid purchases, better control of air conditioning costs, a clearer picture of the evening peak, and a system that is sized to the load that actually exists. The benefit is not only the electricity bill: stable room temperatures, reliable refrigeration and a centre that stays comfortable in Queensland heat are quality and safety benefits as well. A live display in reception, as in the published Queensland examples, also gives parents and children a visible sign that the centre takes sustainability seriously.

  • For the children and families: A safe, well-placed system that children cannot reach, with shutdown arrangements that protect them and staff, and with no accessible cabling or live parts in play areas. Safety is the benefit that matters most, and it is the one that must never be traded for a lower price.

  • For the network: Daytime solar that is used on site reduces daytime grid demand without adding large midday exports. A battery that discharges in the evening peak, or a load that shifts into solar hours, helps the network at the times it is under most strain.

  • For the installer and the reviewer: A clear load profile, a confirmed connection approval, a written safety design and honest assumptions about air conditioning, hot water and export make the installer's job straightforward and the reviewer's job possible.

  • Where the sides can conflict: An oversized system that exports heavily at weekends, when the centre is closed, can strain the local network and earn very little for the exported power. A system that ignores child safety to save on cabling or fencing can put children at risk. A battery that is oversized for the evening load wastes capital that could have been spent on air conditioning efficiency. The balance is found in the load profile, the safety design and the contract — not in the panel count.


Frequently asked questions

How much solar does a Queensland childcare centre need?


It depends on the number of places, the rooms, the kitchen, the laundry, the air conditioning and the interval data. A small centre of 25–50 places might investigate 10–20 kW; a mid-size centre of 50–100 places might investigate 20–40 kW; a large centre of 100–150 places might investigate 30–60 kW; a very large centre of 150–200+ places might investigate 50–100 kW. Those are starting ranges for a feasibility study, not recommendations. The load profile decides, and the load profile comes from your data.


Will solar cut our bill by 90%, as one published case study reports?


The Upper Mount Gravatt Kindergarten case study reports the bill fell by over 90%, but that is an installer-published figure for that centre, under that tariff, with that load and that system. It is not presented here as verified by EServices4U, and it is not a promise for your centre.


Is solar safe around small children?


A correctly designed, correctly installed and correctly maintained system can be safe around children — but safety must be designed in, not assumed. Panels out of reach, inverters in locked locations, no accessible cabling, module-level or rapid shutdown, batteries in locked, fire-separated locations, fencing, signage and staff training are all part of the answer.


What happens to our solar on weekends and holidays when we are closed?


Solar still generates. On a sunny weekend, a system sized for weekday loads will export a large share of its generation, earning the feed-in tariff — which is usually far below the retail price. That is why sizing for the weekday load, and testing the business case with realistic weekend and closure export, matters more than adding panels.


Do we need a battery?


Not every centre does. A battery is worth a serious look if you have a meaningful evening load — cleaning, laundry finishing, office work, security — or if you need backup for fridges, freezers and emergency lighting through a brief outage. It is not worth buying to "store weekend solar" for Monday, or to make an oversized system economic.


What export limit will we get in Queensland?


It depends on your network, your phase and your location. As a published guide summary, single-phase connections are commonly described as 10 kW of solar with 5 kW of export, and three-phase as 30 kW of solar with 15 kW of export. Confirm your connection approval for your site — Energex in South East Queensland, Ergon Energy in regional Queensland — before relying on any figure.


Does the Cheaper Home Batteries Program apply to our centre?


It is a residential program, and it began on 1 July 2025. A commercial childcare centre should not assume it applies to its site. Verify eligibility and the current program rules for your system size and installation type before including any battery incentive in a business case.


What is the 1 January 2027 STC step-down?


Published guide figures describe solar deeming stepping down from five years to four years, and the battery STC factor stepping down from 6.8 to 5.7, from 1 January 2027. The installation date sets the rate.


What does the SRES mid-scale scheme mean for a large centre?


It is reported that applications opened on 17 November 2026 for systems from 100 kW to 1 MW, with fixed five-year deeming, and that a system claims either STCs or REGOs, not both.


We lease our building. Can we still install solar?


Often, yes — but only with landlord consent in writing, a lease term long enough to recover the investment, and a written agreement about what happens to the system at the end of the lease, if the centre is sold, or if the operator changes.


Should we get an independent review before signing?


For a commercial system in a childcare setting, yes — particularly where the quote involves a battery, a dynamic connection, a lease or PPA, or a system that must be designed around children's safety.


What should we do first?


Gather twelve months of interval data, your tariff and demand charges, your connection approval, your lease and landlord consent position, and your air conditioning, kitchen and laundry details. Then get the load profile and the safety design studied before any system size is chosen.


Get an independent check before you sign

  • Start with a free 15-minute consultation to talk through your centre, system, or project and find out which fixed-fee review fits, if any. Call/WhatsApp 0480 001 498 or email growthpartner@eservices4u.com.au. No obligation, and it does not include a written report.

  • Residential quote review from $149 — for homeowners comparing solar and battery quotes.

  • Solar and battery feasibility assessment from $299 — load profile, sizing, tariff and export checks for homes and small businesses.

  • Home Owner's Engineer from $599 — independent oversight for a residential solar and battery project.

  • Commercial Infrastructure Assessment / RPEQ & RPEV SLD Sign-Off from $495 — for commercial sites, including childcare and early learning centres with larger systems, switchboard work and network documentation.


Learn more about how EServices4U works at EServices4U, see packages and pricing, read about the Owner's Engineer service, meet the team, and request a quote. EServices4U is based in Queensland and serves clients Australia-wide, and does not sell solar installations or receive installer commissions. The advice is independent: it is there to help you assess technical suitability, value, risk and compliance before you commit to an expensive energy project.