Queensland Commercial Laundry Solar: Hot Water, Dryers and Bills That Shrink

1 hour ago
22 min read

A commercial laundry is not like other commercial solar sites. A warehouse or a car dealership spends most on electricity, used mainly in the daytime — exactly when solar panels produce. A laundry is different. Its biggest cost is usually heat — gas for steam, for ironers and for dryers — and a rooftop solar array on its own does nothing to that gas bill. That is the first thing any Queensland laundry operator needs to understand before signing a solar proposal, whether they run a hospital linen plant in Brisbane or a coin-op laundromat in Rockhampton.


This guide covers both ends of the Queensland laundry market: the large commercial processor running tunnel washers, ironers and boilers, and the small laundromat running banks of washers and dryers under a suburban shopfront roof. The physics is the same at both scales; the equipment, the money and the decisions are not, and this guide treats them separately wherever that matters.


It is written for owners, operations managers and facilities managers who are being quoted solar, heat pumps or heat recovery — and for the people who have to sign off on those quotes. Nothing here is a promise about what your site will save. Every installer figure is labelled as installer-published, and anything we could not verify on the day of writing is flagged in the text for you to check before you rely on it.


Commercial laundry in Queensland with rooftop solar panels above industrial washers, dryers and hot water plant

Why a laundry is a different kind of solar site

The load is thermal before it is electrical. In a steam-heated laundry, gas typically accounts for 45–65% of total energy, according to a Brisbane installer guide for commercial laundries accessed on 27 November 2026. That figure is installer-published, but the direction matches the physics: washing, drying and ironing linen is mostly about heating water and air. Electricity runs the motors, pumps, drives, folding lines, lighting and office. Gas makes the steam, heats the ironer chests and fires the dryers.


The load is daytime, which is genuinely good news for solar. Most Queensland laundries run their heaviest production between about 6 am and 4 pm, as hospitals, hotels and aged-care homes deliver linen in the morning and want it back the same day or the next. That lines up well with solar generation, which in South East Queensland typically ramps from about 8 am, peaks between 10 am and 2 pm, and tapers through the afternoon. A laundry running washers, dryers and ironers through the middle of the day is one of the better solar matches in the commercial sector — for the electrical part of its load.


The load is also spiky, and water is the hidden third bill. Tunnel washers, dryers and ironers do not draw power smoothly — motors start, dryers cycle, steam valves open and close — and that spikiness creates demand charges on many commercial network tariffs. A mid-size healthcare laundry processing 4 tonnes of linen per hour typically uses 35,000–55,000 litres of water and 280–420 kWh of electricity per tonne of linen, according to the same Brisbane installer guide — installer-published figures. Every litre of water entering a washer has to be heated, pumped, treated and discharged, which is why heat recovery matters as much as the solar array itself.


Where laundry energy actually goes

Gas is usually the biggest share. On a steam-heated site, gas feeds the boiler, and the boiler feeds everything thermal: process steam for the tunnel washer, steam or direct gas heat for the ironer, and gas-fired tumble dryers. The installer guide's 45–65% range is a figure to test against your own gas and electricity bills, not a fact about your site. The only number that matters for your business case is your own: twelve months of gas bills next to twelve months of electricity bills, on the same page.


Electricity runs the machines and the building. Washer and extractor motors, tunnel washer drives, ironer drives, folding lines, compressed air, pumps, lighting, ventilation and office loads. On an electrically heated site — common for smaller laundromats — electricity can be 70% or more of the energy bill, which changes the business case completely. That is one reason a laundromat and a hospital linen plant need different advice.


Heat leaves through the roof and the drain. Dryer exhaust air leaves hot. Tunnel washer drain water leaves warm. Ironer condensate leaves hot. In a conventional laundry, all of that heat is thrown away. Recovering even part of it is often cheaper per unit of energy than generating new energy, whether from gas or from solar. This is the single most overlooked point in laundry solar proposals: the cheapest energy is the energy you stop wasting.


Energy use

What it powers

Typical fuel

Why it matters for solar

Process steam and boiler

Tunnel washers, ironers, heating

Gas (usually the largest share)

Solar PV does not directly reduce it — heat pumps and heat recovery do

Tumble dryers

Drying linen after extraction

Gas or electricity

Dryer exhaust heat recovery reclaims heat; daytime electric dryers suit solar

Washers and extractors

Washing, spinning, pumping

Electricity

Daytime motors are a good solar match

Ironers and calenders

Drying and pressing flatwork

Gas, steam or electricity

Large steady daytime load; heat source decides the solar benefit

Hot water

Wash water at 60–85°C

Gas, electricity or heat pump

Heat-pump hot water powered by solar is the key gas-displacement step

Folding, lighting, office

Finishing lines, building services

Electricity

Steady daytime load, straightforward solar match


Why solar alone does not fix the gas bill

A solar array makes electricity, not steam. If gas is half your energy spend, a solar system that cuts your electricity bill by two-thirds has cut your total energy bill by about a third. That can still be a worthwhile project. But it is not the 55–75% combined energy reduction that a Brisbane installer guide advertises for a combined solar, heat-pump and heat-recovery package. That larger figure is installer-published, it describes a combined package rather than solar alone, and it should be read as a marketing claim to be tested against your own bills, not as a result your site will achieve.


The honest sequence is: reduce heat demand first, then electrify what remains, then generate the electricity. Heat recovery from dryer exhaust and drain water reduces the amount of heat you need to buy. A heat-pump hot water system then supplies a share of the remaining hot water using electricity instead of gas, and solar PV supplies some of that electricity. Each step makes the next one smaller and cheaper. A proposal that jumps straight to the solar array, without a heat-recovery or hot-water step, is usually leaving the biggest saving on the table.


Beware the single-number pitch. If a proposal gives you one percentage — "cut your bill by 65%" — ask which bill, over what period, and against what baseline. Is that the electricity bill or the combined gas-plus-electricity bill? Does it include the gas displaced by the heat pump, or only the solar generation? An independent review exists precisely to ask these questions before you sign, not after the panels are on the roof.


The combined play: solar, heat-pump hot water and heat recovery

Four measures, one system. The combination the Brisbane installer guide describes — rooftop solar, heat-pump hot water, dryer-exhaust heat recovery and tunnel-washer drain heat recovery — is the right shape of solution for a large Queensland laundry. The installer-published claim attached to it is a 55–75% combined energy reduction, with a typical payback of 3–5 years after STCs, LGCs and other incentives. Both figures are installer-published claims, and the payback figure depends on certificate prices, tariffs and your site's actual load — it cannot be taken as a promise for any specific site.


Heat-pump hot water is the bridge between solar and gas. A commercial heat pump uses electricity to move heat from the air into water, rather than making heat by burning gas. In Brisbane's warm climate that is an efficient exchange, which is why the installer guide quotes a coefficient of performance of typically 3.5–4.8 at Brisbane ambient temperatures — again, installer-published. Size the heat pump for the laundry's real hot-water demand, including morning peaks, with storage to carry the washers through cloudy periods and early starts — undersized storage is one of the commonest reasons a heat-pump retrofit disappoints.


Dryer-exhaust and drain heat recovery reclaim heat you have already paid for. Industrial tumble dryers push out large volumes of hot, moist air, and a heat exchanger in that exhaust stream can preheat incoming process water or make-up air. The installer guide states that dryer-exhaust heat recovery typically reclaims 35–55% of exhaust thermal energy — installer-published, and dependent on your exhaust temperatures and on having a use for the recovered heat. Tunnel washers discharge warm water continuously, and a drain-water heat exchanger transfers that heat into incoming cold water. Lint is the maintenance issue to plan for: dryer exhaust carries lint, lint fouls heat exchangers, and any proposal should include the filtration, cleaning access, maintenance schedule and cost.


Tunnel washers versus washer-extractors

Tunnel washers are continuous, and that changes the energy picture. A continuous batch washer moves linen through a series of pockets, typically 35–110 kg per pocket according to the Brisbane installer guide, with throughputs of 200–800 kg per hour common for mid-size and large plants. Water reuse is the energy advantage: rinse water from later stages is reused in earlier stages. The challenge is that the flow is continuous — heat demand does not stop between loads, and drain water runs warm all day. That is exactly what makes drain heat recovery worthwhile on a tunnel-washer site.


Washer-extractors are batch machines, and their load is lumpy. A washer-extractor washes one load at a time, typically 60–250 kg per machine according to the same installer guide, then extracts at high speed. The electrical load spikes with each extraction, and the hot-water demand arrives in pulses as each machine fills. That lumpiness matters for battery sizing — a battery that shaves the extraction spikes may be worth more here than on a tunnel site with a smoother load — and for heat-pump storage, which has to absorb the pulses.


Ironers, calenders and finishing

The ironer is often the largest single thermal load in the plant. Flatwork ironers — also called calenders — dry and press sheets and table linen in one continuous pass. Typical machines run a chest width of 1.2–3.5 metres at 25–60 metres per minute, according to the Brisbane installer guide, and are heated by gas or steam, with thermal ratings commonly in the range of 300–600 kW. Those figures are installer-published. A large, steady heat load is exactly what heat recovery and heat-pump preheating are designed to serve — but solar PV cannot serve it directly, which is why the ironer must not set the size of the solar array. Size the array against the electrical load that will actually be displaced, with the thermal measures sized separately against the heat load.


Dryers, boilers and hot water temperatures

Industrial dryers are the hungriest machines in the building. A typical industrial tumble dryer takes a 100–250 kg load and is gas-heated at 200–450 kW thermal each, according to the Brisbane installer guide, with four to twelve dryers common in a larger facility. Those figures are installer-published. Whether your dryers are gas or electric changes the solar case completely: an electric dryer is a large daytime electrical load that solar can serve directly, while a gas dryer is a thermal load that solar can only serve indirectly.


The boiler is where the gas bill is made. On a steam-heated site, a central boiler supplies steam to the tunnel washer, the ironer and any steam-heated dryers. Steam leaks, failed steam traps, uninsulated pipework and condensate losses all add directly to the gas bill, and all are cheaper to fix than a solar array is to buy. A steam-trap survey and a lagging check should come before, or at least alongside, any generation proposal.


Hot water temperatures are a process requirement, not a preference. Wash processes in a commercial laundry typically run at 60–85°C, according to the Brisbane installer guide, with healthcare linen at the upper end. Those temperatures drive the thermal load, and they set the limit on what a heat pump can do on its own: a heat pump that efficiently delivers 60°C water may struggle, or cost more to run, at 80°C-plus. The design needs to be honest about which part of the temperature lift the heat pump does and which part a gas booster or the boiler still does. A proposal that quotes a heat-pump coefficient of performance without stating the delivery temperature is not giving you a comparable number.


Solar thermal is the older Queensland answer, and it still has a place. Before heat pumps became common, solar hot water — collectors on the roof heating water directly — was the standard way to use Queensland sunshine for laundry hot water. A case recorded in the Queensland Eco-efficiency Group's water-heating guide for Queensland manufacturers shows what that looked like: a laundry and dry-cleaning business replaced twelve 15 hp gas-fired steam boilers with two 15 hp boilers plus a solar, gas-boosted hot water system — thirty solar panels and nine 315-litre storage tanks providing 75% of the energy required to heat 5,000 litres of 75°C hot water used daily. The guide cites a 2005 case study of a South Australian laundry, so it is an older interstate example reproduced in a Queensland guide — but for a laundry with a suitable roof and a steady hot-water demand, solar thermal preheat deserves to be compared alongside a heat pump rather than assumed away.


Daytime production and the solar match

Self-consumption is the number to interrogate. A proposal should state the expected self-consumption — the share of solar generation used on site — and show how it was calculated. A laundry running six days a week will have a different self-consumption from one running five days, because weekend generation has nowhere to go on a closed site. The Holy Cross Laundry case in Brisbane, covered below, illustrates the point: the site estimated that 8–10% of its solar generation was wasted to the grid on weekends, because all of the solar fed through one of its two meters.


Shift patterns matter more than roof size. A laundry that starts at 5 am and finishes at 2 pm uses solar differently from one that runs 7 am to 6 pm with an evening finishing shift. Early starts mean the first hour runs on grid power before the array ramps up; evening finishing means the last hour runs on grid or battery power after the array has tapered. East-facing panels can help an early start, west-facing panels a late finish, and a split array can serve both. A proposal that puts all panels facing north, without discussing your shift pattern, has not been designed for your site. Cloud and storm season are part of the Queensland picture too: output varies day to day, so size storage conservatively and keep the boiler or gas booster as a back-up for hot water. Check this before you sign: the specific wind-region classification for your site should be confirmed by the designer for your address; do not accept a generic "cyclone-rated" claim without the classification it refers to.


Demand charges and what a battery can (and cannot) do

Demand charges punish peaks, not totals. Many Queensland commercial sites are on tariffs that include a demand charge — based on the highest power drawn in a period, usually measured in kVA or kW over a half-hour interval. A laundry with a spiky load can pay a substantial demand charge even if its total energy use is moderate. Solar reduces demand charges only to the extent that it is generating at the moment of the peak. A peak at 7 am, before the array is producing, is not reduced by solar at all.


A battery earns its place by shaving peaks and covering evening work. A battery charged from midday solar can discharge into the late-afternoon peak, reducing the maximum demand the site draws from the grid, and can keep evening finishing lines running on stored solar instead of imported power. The Brisbane installer guide describes a typical mid-size package as a 300 kW solar array with a 200 kWh battery — installer-published, as an example of a package rather than a recommendation for any specific site. Whether a battery pays for itself depends on your tariff's demand component, the size and timing of your peaks, and the battery's price. Batteries do not make steam: a battery stores electricity and cannot directly displace gas in a boiler or a gas dryer.


The federal battery discount does not apply to a commercial laundry. The federal Cheaper Home Batteries Program, which began on 1 July 2025, is a residential program. It does not apply to a commercial laundry installation, and a proposal that suggests otherwise is wrong. Commercial-scale batteries have their own certificate pathways, and the battery STC factor changes on 1 January 2027. The Australian Energy Regulator's final decision of 30 October 2026 is relevant here: it refused requests from Energex and Ergon Energy to remove optional demand and flexible-load tariffs, so the demand-based tariff options that make battery demand-shaving worthwhile remain available. Your tariff, load shape and peaks decide whether a battery pays.


Export limits and connection approvals — Energex and Ergon

You cannot assume you can export. Connecting a commercial solar system to the Queensland network requires approval from your distributor — Energex in South East Queensland, Ergon Energy in regional Queensland. The distributor sets the export limit for your connection, and that limit may be well below the size of the array you want to install. A 300 kW array on a site with a small export limit will need export-limiting equipment, a larger self-consumption case, or a staged design. Confirm the export limit with the distributor before the system is sized, not after it is installed.


Confirm-your-approval wording is not a formality. Any proposal that says "export approval will be arranged" without naming the distributor, the connection process and the export limit applied for is leaving the most common source of commercial solar delay unaddressed. Ask for the application reference, the approved export limit, and the conditions attached to it — and check that the inverter settings and any export-limiting device match the approval. Zero export is sometimes the right answer: if your daytime load reliably absorbs everything the array produces, a zero-export arrangement can be simpler and faster to approve.


Feed-in rates are low, and regional Queensland has a set rate. For regional Queensland customers on Ergon Energy's network, the Queensland Competition Authority set a regional feed-in tariff of 6.006c/kWh from 1 July 2026. At that rate, a kilowatt-hour exported is worth a small fraction of a kilowatt-hour used on site. In South East Queensland, feed-in rates are set by retailers, so the exact rate depends on your retailer and plan — confirm it from your own bill, and do not accept a proposal that assumes a feed-in rate without naming it.


Roof, structure and switchboard checks

A laundry roof carries more than panels. Collectors, heat-pump units, storage tanks and PV arrays all add weight, and a laundry roof may already carry ventilation plant, exhaust stacks and ducting. Before any array is sized, the roof structure should be checked by a suitably qualified engineer — particularly on older industrial buildings in Brisbane's inner suburbs. Nine 315-litre storage tanks hold nearly three tonnes of water before the tanks themselves are counted. Fire-service access, setbacks and labelling also apply to rooftop solar. Check this before the layout is finalised: confirm the specific fire-access and setback requirements for your building with the designer and your insurer.


Healthcare linen and hygiene

Healthcare linen is processed to documented hygiene requirements. Hospitals and aged-care homes set hygiene and infection-control requirements for their linen, and a laundry serving those customers must be able to show it meets them — through wash temperatures, process control, segregation of soiled and clean linen, and documentation. Solar, heat pumps and heat recovery change how heat is supplied; they must not change whether the wash process reaches the temperatures and holding times the customer requires. Check any change to the hot-water system against the customer's hygiene specification before it is approved, not after.


Do not let an energy proposal rewrite a hygiene process. A heat pump that delivers water at a lower temperature than the boiler did, or heat recovery that reduces the temperature of water entering the wash, can affect the wash outcome if the design has not allowed for it. The energy designer and the laundry's process owner need to agree, in writing, on the temperatures the wash process requires at each stage. The applicable healthcare linen standard needs to be confirmed for your site. Check this before any hot-water or process change is designed: the specific Australian Standard and any state health requirements that apply to your healthcare linen contract should be confirmed with your customer and a suitably qualified adviser.


The small end: laundromats and coin-op sites

A laundromat is a different business with the same physics. A coin-op or card-operated laundromat typically runs banks of commercial washers and dryers, often 10–30 machines, under a shopfront or small industrial roof. The energy split depends on whether the dryers are gas or electric: gas dryers mean a gas bill that solar cannot touch directly, while electric dryers mean a large daytime electrical load that solar can serve well. The first question for any laundromat solar proposal is which type of dryer you have. The second is how your wash water is heated — gas or electric — because a heat-pump hot water system or drain heat recovery can cut that cost too.


Daytime loads are the laundromat's advantage — and the roof is usually the constraint. Laundromats are busiest during the day, and many run seven days a week, which helps solar: unlike a five-day processor, a laundromat uses power on weekends too, so less generation is wasted. A modest array — commonly in the tens of kilowatts rather than the hundreds — can cover a meaningful share of that daytime load. But a suburban laundromat may have a small or shared roof, and shading and orientation matter more at this scale — a proposal should include a shade analysis and a roof-condition check.


Leased premises and split incentives

Most laundromats and many small laundries lease their premises. That creates the classic split incentive: the tenant pays the energy bills and would benefit from solar, while the landlord owns the roof and would have to approve — and possibly pay for — the installation. Before any design work, the tenant and landlord need to agree on who pays, who owns the system, what happens at the end of the lease, and who benefits from the feed-in tariff and any certificates. A solar array is a 25-year asset, so a laundromat on a three-year lease with no renewal option is a poor fit for a tenant-funded array, unless the agreement covers removal, transfer or compensation. A laundromat in a shopping centre or strata building also needs centre-management or body-corporate approval, so build that time into the schedule.


What changed in November 2026 — the dated updates

Mid-scale SRES applications opened on 17 November 2026. The Clean Energy Regulator opened applications in the REC Registry on 17 November 2026 for small-scale technology certificates for mid-scale solar systems — systems of more than 100 kW and up to 1 MW, installed on or after 1 October 2026. The deeming period is fixed at five years, and a system receives STCs or renewable energy guarantee of origin certificates (REGOs), not both. The government estimate reported with the opening was that the support could cover about 20 per cent of the upfront cost, with about $68,000 for a 250 kW system given as a government estimate. This matters directly for laundries: a 100–800 kW laundry array sits squarely in the mid-scale band. Eligibility and evidence requirements still apply — confirm them against the Regulator's published guidance.


The STC step-down arrives on 1 January 2027. From 1 January 2027, the solar deeming period steps down from five years to four years, and the battery STC factor steps down from 6.8 to 5.7, under the arrangements published for that date. For a laundry planning a system in late 2026, the timing of installation against that step-down affects the certificate value — but it should not be the reason to rush a poorly designed project. A system installed in haste to beat a deadline, with the wrong export limit or an undersized heat pump, will cost more over its life than the certificates it gained.


Inspection findings are a warning about installer quality. The Clean Energy Regulator's 2025–26 SRES inspection report, published on 16 November 2026, found that 61.19% of inspected battery systems were rated substandard and 23.11% of inspected solar systems were rated substandard, with under 1% rated unsafe. Those percentages describe inspected installations only — they are not the failure rate of all Australian solar — but they are directly relevant to a laundry owner choosing an installer. The protections: an accredited installer, a design that has been independently checked, commissioning records, and a system inspected after installation rather than assumed correct.


Dated update

What changed

Source and date

What it means for a laundry

Mid-scale SRES opens

STC applications open for 100 kW–1 MW systems installed from 1 Oct 2026; 5-year deeming; STCs or REGOs, not both

Clean Energy Regulator, 17 Nov 2026

Large laundry arrays now have a certificate pathway

STC step-down

Solar deeming 5 to 4 years; battery factor 6.8 to 5.7

Arrangements for 1 Jan 2027

Timing affects certificate value; not a reason to rush

Inspection report

61.19% of inspected batteries substandard; 23.11% of inspected solar substandard; under 1% unsafe

Clean Energy Regulator, 16 Nov 2026

Installer quality and independent checks matter

AER tariff decision

Energex/Ergon requests to remove optional demand tariffs refused

Australian Energy Regulator, 30 Oct 2026

Demand tariffs that reward batteries remain available

Regional feed-in rate

6.006c/kWh for regional Queensland

Queensland Competition Authority, from 1 Jul 2026

Export is worth far less than on-site use


Queensland examples that are actually on the record

Holy Cross Laundry, Banyo, Brisbane — 438 kW of solar on a working laundry. The best-documented Queensland laundry solar example available on the day of writing is Holy Cross Laundry at Banyo, in Brisbane's north. According to a case study published in February 2026, the laundry installed a 438 kW solar system comprising 922 panels on its roof, supported by a grant of $536,804. The aim was to cut grid dependency by 36% and offset 488 tonnes of carbon dioxide per year, with an estimated $60,000 first-year energy cost reduction and at least $900,000 over ten years on estimated costs at the time. Those financial figures are estimates from the case study, not measured outcomes.


The measured results are the useful part. In the six months before solar was available, the laundry's average daily electricity consumption was 4,300 kWh, with average monthly greenhouse gas emissions of 87 tonnes. In the twelve months from July 2024 to June 2025, after installation, average daily consumption was 3,000 kWh, with average monthly emissions of 60 tonnes — a 31% reduction in grid-based power use and a 30% reduction in associated greenhouse gas emissions. Those are measured figures, and a realistic illustration of what a large solar array does on a working laundry: a substantial cut in grid electricity, not an elimination of the energy bill. The case study also records that an estimated 8–10% of solar generation was wasted to the grid on weekends, because the system fed through one of the site's two meters.


Alsco Uniforms, Salisbury — an installer-published large-scale example. A Brisbane commercial solar installer reports a 400 kW system at Alsco Uniforms' processing facility in Salisbury, on Brisbane's southside, meeting 72–75% of the site's energy demand even in winter and cutting Scope 2 emissions by 55%. Those figures are installer-published and have not been independently verified for this guide. The facility spans two property titles, each with its own energy provider and meter, and had recently been through a transformer upgrade. Multi-meter and multi-title sites are common in Queensland industrial areas — allow extra time and confirm the metering arrangement early.


How This Works for Both Sides

For the laundry owner and operator. A properly designed project cuts the bills that can be cut — electricity through solar, gas through heat recovery and heat-pump hot water — without interrupting production or compromising wash quality. The daytime load matches solar well, the heat-recovery measures pay back through energy that is already being bought and thrown away, and good metering gives the business data its hospital, hotel and aged-care customers increasingly ask for. The risk is a proposal that overpromises on the gas bill, under-delivers on hot water, or is sized for a roof rather than a load.


For the customer — the hospital, hotel or aged-care home buying the linen service. A laundry that can show metered energy data, a lower emissions intensity per kilogram of linen, and a documented hygiene process is a stronger supplier. Energy work that is done properly supports the laundry's customer relationships; energy work that compromises wash temperatures or hygiene documentation puts them at risk. That is why the hygiene constraint belongs at the start of the project, not at the end. Laundries that use more of their solar on site, shift load into the middle of the day and shave their evening peaks also reduce pressure on the Queensland network — a genuine public benefit, but not a reason for any individual laundry to install a system that does not pay for itself.


What to check before signing

Get the numbers that belong to your site. Twelve months of gas and electricity bills, the machine schedule, operating hours, hot-water temperatures and wash volumes. Any business case built without those is built on someone else's laundry. Ask for the split. How much of the claimed saving is electricity, and how much is gas? How much comes from solar, the heat pump, and heat recovery? If the proposal cannot show the split, it has not done the calculation. Confirm the connection. Distributor, export limit, application reference and conditions — Energex in South East Queensland, Ergon Energy in regional Queensland — confirmed before the array is sized. Check the heat design, not just the panels. Heat-pump delivery temperature and storage size, dryer-exhaust heat-recovery maintenance and lint filtration, drain heat-recovery cleaning access, boiler condition and steam traps, condensate return. Check the installer. Clean Energy Council accreditation, Queensland electrical licensing, insurance, and references from laundry or similar process-heavy sites. Check the incentives properly. Mid-scale SRES eligibility for systems over 100 kW installed from 1 October 2026, with applications open since 17 November 2026; the 1 January 2027 step-down; and the federal Cheaper Home Batteries Program is residential only. Confirm certificate values in writing, and with your accountant. Check the lease, the roof and the switchboard. Who owns the roof, who approves the installation, what happens at the end of the lease, whether the roof structure has been checked by an engineer, and whether the switchboard has capacity for the connection. Get an independent review of the tender. A fixed-fee review of the sizing, heat balance, tariffs, connection approval and contract costs a fraction of the system and is the cheapest way to catch the errors that are expensive after installation.


Frequently asked questions

Can solar panels cut a commercial laundry's gas bill?


Not directly. Solar panels generate electricity, and a gas boiler, gas dryer or gas ironer does not use electricity. Solar can cut the gas bill indirectly: a heat-pump hot water system powered by solar can displace gas used for water heating, and heat recovery from dryer exhaust and drain water can reduce the amount of heat the boiler has to supply.


What is the mid-scale SRES change, and does it affect my laundry?


The Clean Energy Regulator opened mid-scale Small-scale Renewable Energy Scheme applications on 17 November 2026 for systems from 100 kW to 1 MW, installed on or after 1 October 2026, with a fixed five-year deeming period and STCs or REGOs — not both. If your laundry's array is in that band, the change gives you a certificate pathway that did not previously exist for systems above 100 kW.


Is a battery worth it for a laundry?


Sometimes. A battery earns its place when it shaves demand-charge peaks, covers evening finishing work, or stores weekend solar that would otherwise be exported at a low feed-in rate. It does not displace gas, and it does not pay for itself on every site. The answer depends on your tariff, your load shape and the battery's price.


Our laundry serves hospitals. Will solar or a heat pump affect our hygiene compliance?


It must not. Wash temperatures and holding times are set by your customer's hygiene requirements, and any change to the hot-water system must meet them. Agree the required temperatures in writing with your customer and your process owner before the energy design is approved, and confirm the applicable standard for your contract — check the specific standard number with your customer and a suitably qualified adviser, as it depends on the contract and jurisdiction.


What did the Holy Cross Laundry project in Brisbane actually achieve?


According to a case study published in February 2026, Holy Cross Laundry at Banyo installed a 438 kW solar system of 922 panels. In the twelve months from July 2024 to June 2025, average daily grid electricity use was 3,000 kWh, down from 4,300 kWh in the six months before solar — a 31% reduction in grid-based power use, with a 30% reduction in associated greenhouse gas emissions. The case study also records that an estimated 8–10% of solar generation was wasted to the grid on weekends, because the system fed through one of the site's two meters.


How do I know if a solar proposal for my laundry is any good?


Check the split between electricity and gas savings, the heat design as well as the panels, the distributor export limit, the installer's accreditation and laundry references, and the incentive claims against the Clean Energy Regulator's published guidance. Then have the proposal independently reviewed before you sign.


Talk to EServices4U before you sign

  • Start with a free 15-minute consultation to talk through your tender, system, building, or project and find out which fixed-fee review fits, if any. Call/WhatsApp 0480 001 498 or email growthpartner@eservices4u.com.au. No obligation, and it does not include a written report.

  • Residential quote review from $149 — an independent check of the sizing, pricing and claims in a homeowner's solar and battery quotes.

  • Solar and battery feasibility assessment from $299 — for homes and small businesses deciding whether solar and storage stack up before committing.

  • Home Owner's Engineer from $599 — independent engineering support through design, installation and commissioning.

  • Commercial Infrastructure Assessment / RPEQ & RPEV SLD Sign-Off from $495 — an independent review of a commercial tender, design or single-line diagram, including laundries, with RPEQ or RPEV sign-off where required.


EServices4U is independent. It does not sell solar installations and does not receive installer commissions, so its advice is not tied to any product or installer. It is based in Queensland and serves Australia-wide — "Based in QLD, Serving Australia-Wide".


Find out more about the services at EServices4U, see fixed-fee pricing at packages and pricing, read about independent engineering support at Owner's Engineer, meet the team at our team, or request a review at request a quote. For a laundry tender, a heat-pump proposal or a solar design that needs a second set of eyes, the free 15-minute consultation is the place to start.